They hauled out the old concrete on Saturday. It took 3 trips to the remove the driveway. They plan on grating the surface on Monday and then pour the new concrete on Tuesday.
This entry was posted
on Sunday, July 29th, 2007 at 4:49 pm and is filed under Home.
You can leave a response, or trackback from your own site.